IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

995

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 04 Y:2006 04 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $64,647 $2,500 Not Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented
LE0226 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $14,515 $800 Implemented
LE0226 # 07 Y:2006 07 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,946 $16,000 Not Implemented
LE0226 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
IC0112 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,787 $157,465 Implemented
IC0112 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,753 $2,300 Implemented
IC0112 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,114 $0 Implemented
IC0112 # 01 Y:2006 01 2006 REPLACE BOILER $300,562 $414,240 Not Implemented
IC0112 # 02 Y:2006 02 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $57,168 $11,016 Implemented
IC0112 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $44,296 $145,126 Implemented
IC0112 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,495 $66,129 Not Implemented
IC0112 # 05 Y:2006 05 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $28,585 $165,480 Not Implemented
IC0111 # 01 Y:2006 01 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $803,012 $258,000 Implemented
IC0111 # 02 Y:2006 02 2006 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $95,000 $442,680 Not Implemented
IC0111 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $186,788 $135,156 Not Implemented
IC0111 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $93,000 $235,998 Implemented
IC0111 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,047 $30,000 Not Implemented
IC0111 # 06 Y:2006 06 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $57,000 $36,000 Not Implemented
IC0111 # 07 Y:2006 07 2006 USE MINIMUM STEAM OPERATING PRESSURE $22,776 $0 Implemented
IC0111 # 08 Y:2006 08 2006 REPAIR AND ELIMINATE STEAM LEAKS $9,304 $2,800 Implemented
IC0111 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $158,427 $5,152 Implemented