Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
995
matching recommendationsNAICS | 3251 | Basic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0226 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $154,145 | $75,000 | Implemented |
LE0226 # 02 Y:2006 | 02 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $109,146 | $363,000 | Not Implemented |
LE0226 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $81,919 | $51,275 | Implemented |
LE0226 # 04 Y:2006 | 04 | 2006 | IMPROVE COMBUSTION CONTROL CAPABILITY | $64,647 | $2,500 | Not Implemented |
LE0226 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,061 | $47,500 | Implemented |
LE0226 # 06 Y:2006 | 06 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $14,515 | $800 | Implemented |
LE0226 # 07 Y:2006 | 07 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $8,946 | $16,000 | Not Implemented |
LE0226 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $500 | Implemented |
IC0112 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $48,787 | $157,465 | Implemented |
IC0112 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,753 | $2,300 | Implemented |
IC0112 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,114 | $0 | Implemented |
IC0112 # 01 Y:2006 | 01 | 2006 | REPLACE BOILER | $300,562 | $414,240 | Not Implemented |
IC0112 # 02 Y:2006 | 02 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $57,168 | $11,016 | Implemented |
IC0112 # 03 Y:2006 | 03 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $44,296 | $145,126 | Implemented |
IC0112 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,495 | $66,129 | Not Implemented |
IC0112 # 05 Y:2006 | 05 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $28,585 | $165,480 | Not Implemented |
IC0111 # 01 Y:2006 | 01 | 2006 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $803,012 | $258,000 | Implemented |
IC0111 # 02 Y:2006 | 02 | 2006 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $95,000 | $442,680 | Not Implemented |
IC0111 # 03 Y:2006 | 03 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $186,788 | $135,156 | Not Implemented |
IC0111 # 04 Y:2006 | 04 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $93,000 | $235,998 | Implemented |
IC0111 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,047 | $30,000 | Not Implemented |
IC0111 # 06 Y:2006 | 06 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $57,000 | $36,000 | Not Implemented |
IC0111 # 07 Y:2006 | 07 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $22,776 | $0 | Implemented |
IC0111 # 08 Y:2006 | 08 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $9,304 | $2,800 | Implemented |
IC0111 # 09 Y:2006 | 09 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $158,427 | $5,152 | Implemented |