IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

980

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0112 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,114 $0 Implemented
IC0111 # 01 Y:2006 01 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $803,012 $258,000 Implemented
IC0111 # 02 Y:2006 02 2006 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $95,000 $442,680 Not Implemented
IC0111 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $186,788 $135,156 Not Implemented
IC0111 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $93,000 $235,998 Implemented
IC0111 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,047 $30,000 Not Implemented
IC0111 # 06 Y:2006 06 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $57,000 $36,000 Not Implemented
IC0111 # 07 Y:2006 07 2006 USE MINIMUM STEAM OPERATING PRESSURE $22,776 $0 Implemented
IC0111 # 08 Y:2006 08 2006 REPAIR AND ELIMINATE STEAM LEAKS $9,304 $2,800 Implemented
IC0111 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $158,427 $5,152 Implemented
IC0111 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $17,406 $19,704 Implemented
IC0111 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,163 $1,600 Implemented
IC0111 # 12 Y:2006 12 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,671 $195,432 Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented
OK0718 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,021 $40,875 Not Implemented
OK0718 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,034 $459 Not Implemented
OK0718 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,239 $8,030 Not Implemented
OK0718 # 05 Y:2005 05 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,243 $5,175 Not Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
LE0215 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,127 $115,500 Implemented
LE0215 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,899 $320 Not Implemented
LE0215 # 03 Y:2005 03 2005 BURN WASTE OIL FOR HEAT $11,172 $3,000 Not Implemented
LE0215 # 04 Y:2005 04 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,220 $1,588 Implemented