Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,015
matching recommendationsNAICS | 3251 | Basic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1032 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,725 | $4,661 | Not Implemented |
UD1032 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,929 | $100,000 | Implemented |
UD1032 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,018 | $10,000 | Not Implemented |
UD1032 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,757 | $0 | Not Implemented |
UD1032 # 01 Y:2022 | 01 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $58,668 | $25,875 | Not Implemented |
MI0393 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,748 | $2,211 | Implemented |
MI0393 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO HEAT WATER | $12,942 | $72,248 | Not Implemented |
MI0393 # 04 Y:2021 | 04 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $11,648 | $3,107 | Not Implemented |
MI0393 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,195 | $1,126 | Not Implemented |
MI0393 # 02 Y:2021 | 02 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $685 | $480 | Implemented |
MI0393 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $100,476 | $227,400 | Not Implemented |
NL0056 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $1,169 | $770 | Implemented |
NL0056 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,013 | $11,549 | Implemented |
NL0056 # 03 Y:2021 | 03 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $8,331 | $4,500 | Not Implemented |
NL0056 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,032 | $1,600 | Implemented |
NL0056 # 01 Y:2021 | 01 | 2021 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $222,300 | $82,500 | Implemented |
UF0558 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,597 | $19,045 | Implemented |
UF0558 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $456 | Implemented |
UF0558 # 03 Y:2020 | 03 | 2020 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $42,983 | $7,127 | Implemented |
UF0558 # 04 Y:2020 | 04 | 2020 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $1,517,489 | $143,275 | Implemented |
UF0558 # 05 Y:2020 | 05 | 2020 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $40,098 | $110,800 | Implemented |
WV0599 # 01 Y:2020 | 01 | 2020 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $126,151 | $250,000 | Not Implemented |
WV0599 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,634 | $94,500 | Implemented |
WV0599 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,793 | $83,200 | Implemented |
WV0599 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,379 | $45,860 | Implemented |