IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

980

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0969 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $4,727 Not Implemented
OK0969 # 04 Y:2017 04 2017 REPAIR AND ELIMINATE STEAM LEAKS $12,697 $2,712 Not Implemented
OK0969 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,138 $23,262 Not Implemented
OK0969 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $2,384 $16,995 Not Implemented
OK0969 # 07 Y:2017 07 2017 PAY UTILITY BILLS ON TIME $4,330 $0 Implemented
OK0969 # 08 Y:2017 08 2017 INSTALL SET-BACK TIMERS $396 $148 Not Implemented
UD0966 # 01 Y:2017 01 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $217,648 $48,962 Not Implemented
UD0966 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $12,245 $25,000 Not Implemented
UD0966 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $270,579 $100,000 Not Implemented
UD0966 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,225 $4,000 Not Implemented
UD0966 # 05 Y:2017 05 2017 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $57,432 $35,000 Not Implemented
UD0966 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,748 $4,000 Not Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
UD0966 # 08 Y:2017 08 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $229,882 $595,039 Not Implemented
UD0966 # 09 Y:2017 09 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $76,595 $198,657 Not Implemented
UM0481 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,978 $3,000 n/a
UM0481 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,854 $34,336 n/a
UM0481 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $18,599 $6,600 n/a
UM0481 # 04 Y:2017 04 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $50,498 $100,000 n/a
UF0501 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,393,980 $3,306,000 Not Implemented
UF0501 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $154,176 $60,284 Implemented
UF0501 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $77,438 $2,184 Implemented
UF0501 # 04 Y:2017 04 2017 REPAIR AND ELIMINATE STEAM LEAKS $32,236 $1,794 Implemented
UF0501 # 05 Y:2017 05 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,058 $39,050 Implemented
UF0501 # 06 Y:2017 06 2017 MODERATE COOLING TOWER OUTLET TEMPERATURE $9,110 $700 Implemented