IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0537 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,109 $108,180 Not Implemented
SD0537 # 02 Y:2016 02 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $21,873 $21,829 Not Implemented
SD0537 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $10,293 $10,000 Not Implemented
SD0537 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $9,320 $22,960 Not Implemented
SD0537 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,406 $10,314 Implemented
SD0537 # 06 Y:2016 06 2016 REDUCE HEAT GAIN BY WINDOW TINTING $2,089 $7,880 Not Implemented
SD0537 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,758 $5,550 Not Implemented
SD0537 # 08 Y:2016 08 2016 USE PHOTOCELL CONTROLS $1,432 $4,070 Not Implemented
SD0537 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,312 $3,610 Implemented
SD0537 # 10 Y:2016 10 2016 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,205 $2,550 Not Implemented
SF0442 # 06 Y:2014 06 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $14,162 $173,094 Not Implemented
SF0442 # 05 Y:2014 05 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $231 $1,559 Implemented
SF0442 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,082 $12,459 Implemented
SF0442 # 03 Y:2014 03 2014 ADD AREA LIGHTING SWITCHES $409 $252 Not Implemented
SF0442 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,864 $2,722 Implemented
SF0442 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,021 $0 Implemented
SF0253 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,369 $9,627 Not Implemented
SF0253 # 04 Y:2003 04 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,627 $50,000 Not Implemented
SF0253 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,274 $9,590 Not Implemented
SF0253 # 02 Y:2003 02 2003 USE MULTIPLE-EFFECT EVAPORATORS $88,799 $75,000 Not Implemented
SF0253 # 01 Y:2003 01 2003 USE PHOTOCELL CONTROLS $715 $120 Not Implemented