IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 32511 Petrochemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0966 # 01 Y:2017 01 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $217,648 $48,962 Not Implemented
UD0966 # 09 Y:2017 09 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $76,595 $198,657 Not Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
UD0966 # 08 Y:2017 08 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $229,882 $595,039 Not Implemented
UD0966 # 05 Y:2017 05 2017 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $57,432 $35,000 Not Implemented
UD0966 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,748 $4,000 Not Implemented
UD0966 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,225 $4,000 Not Implemented
UD0966 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $270,579 $100,000 Not Implemented
UD0966 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $12,245 $25,000 Not Implemented
AM0711 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $62,500 $108,300 Not Implemented
AM0711 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,350 $57,195 Implemented
AM0711 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,630 $9,030 Implemented
AM0711 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $18,515 $60,200 Not Implemented
AM0711 # 05 Y:2016 05 2016 REPAIR AND ELIMINATE STEAM LEAKS $17,450 $26 Not Implemented
AM0711 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,000 $13 Not Implemented
AM0711 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,344 $2,620 Not Implemented
AM0711 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,880 $0 Implemented
AM0711 # 09 Y:2016 09 2016 USE SYNTHETIC LUBRICANT $1,072 $0 Not Implemented
AM0711 # 10 Y:2016 10 2016 PAY BILLS ON TIME TO AVOID LATE FEES $471 $0 Not Implemented
IP0062 # 03 Y:2016 03 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $605 $0 Not Implemented
IP0062 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $13,450 $7 Implemented
IP0062 # 06 Y:2016 06 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $1,743 $2,278 Not Implemented
IP0062 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $19,981 $2,354 Not Implemented
IP0062 # 07 Y:2016 07 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,609 $12,262 Not Implemented
IP0062 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $22 Implemented