Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
389
matching recommendationsNAICS | 32518 | Other Basic Inorganic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2510 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,765 | $200 | n/a |
LS2510 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,682 | $21,000 | n/a |
LS2510 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $287 | $50 | n/a |
LS2510 # 06 Y:2025 | 06 | 2025 | ADJUST BURNERS FOR EFFICIENT OPERATION | $62,919 | $100,000 | n/a |
LS2510 # 07 Y:2025 | 07 | 2025 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,760 | $4,900 | n/a |
LS2510 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,945 | $450 | n/a |
LS2510 # 08 Y:2025 | 08 | 2025 | REPLACE BOILER | $14,158 | $66,000 | n/a |
LS2510 # 04 Y:2025 | 04 | 2025 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $24,480 | $14,000 | n/a |
LE0589 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,206 | $19,974 | n/a |
LE0589 # 05 Y:2025 | 05 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,588 | $5,000 | n/a |
LE0589 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,173 | $4,403 | n/a |
LE0589 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,428 | $3,300 | n/a |
LE0589 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,179 | $800 | n/a |
LE0589 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $651 | $1,275 | n/a |
LE0589 # 01 Y:2025 | 01 | 2025 | INSTALL BACK-UP EQUIPMENT | $125,769 | $50,000 | n/a |
AM0937 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $63,000 | $15,000 | n/a |
AM0937 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $47,464 | $107,580 | n/a |
AM0937 # 03 Y:2025 | 03 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $90,235 | $351,150 | n/a |
AM0937 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $305 | $1,440 | n/a |
AM0937 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,025 | $450,534 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |