Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
369
matching recommendationsNAICS | 32518 | Other Basic Inorganic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0427 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,465 | $10,000 | n/a |
AS0427 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,236 | $20,867 | n/a |
AS0427 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,551 | $2,513 | n/a |
AS0427 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $933 | $8,000 | n/a |
AS0427 # 07 Y:2006 | 07 | 2006 | USE SOLAR HEAT TO HEAT WATER | $904 | $6,400 | n/a |
AS0427 # 08 Y:2006 | 08 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $576 | $22,500 | n/a |
UD0743 # 01 Y:2006 | 01 | 2006 | ADD AREA LIGHTING SWITCHES | $206,125 | $12,880 | Not Implemented |
UD0743 # 02 Y:2006 | 02 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $100,000 | $10,000 | Not Implemented |
UD0743 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,904 | $33,000 | Not Implemented |
UD0743 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $49,086 | $100,000 | Not Implemented |
UD0743 # 05 Y:2006 | 05 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $54,177 | $17,700 | Not Implemented |
UD0743 # 06 Y:2006 | 06 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,328 | $0 | Implemented |
UD0743 # 18 Y:2006 | 18 | 2006 | USE PHOTOCELL CONTROLS | $2,147 | $0 | Not Implemented |
UD0743 # 08 Y:2006 | 08 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $18,000 | $1,750 | Implemented |
UD0743 # 09 Y:2006 | 09 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,000 | $0 | Implemented |
UD0743 # 10 Y:2006 | 10 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $15,000 | $0 | Implemented |
UD0743 # 11 Y:2006 | 11 | 2006 | USE OPTIMUM TEMPERATURE | $13,681 | $0 | Not Implemented |
UD0743 # 12 Y:2006 | 12 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,125 | $12,000 | Not Implemented |
UD0743 # 13 Y:2006 | 13 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $8,946 | $0 | Not Implemented |
UD0743 # 14 Y:2006 | 14 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,158 | $15,600 | Not Implemented |
UD0743 # 15 Y:2006 | 15 | 2006 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $4,060 | $10,000 | Not Implemented |
UD0743 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,181 | $12,130 | Not Implemented |
UD0743 # 17 Y:2006 | 17 | 2006 | USE PHOTOCELL CONTROLS | $2,428 | $1,776 | Not Implemented |
UD0743 # 19 Y:2006 | 19 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,710 | $0 | Not Implemented |
UD0743 # 20 Y:2006 | 20 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,342 | $500 | Implemented |