IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 32518 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0169 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,315 $4,500 Implemented
TT0169 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,943 $1,500 Implemented
TT0169 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $3,461 $3,240 Implemented
TT0169 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,575 $3,500 Implemented
TT0169 # 05 Y:2016 05 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,333 $2,275 Not Implemented
TT0092 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,056 $2,500 Not Implemented
TT0092 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,621 $10,640 Not Implemented
TT0092 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $683 $683 Not Implemented
TT0092 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,678 $29,400 Not Implemented
TT0092 # 10 Y:2012 10 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $758 $864 Not Implemented
TT0092 # 09 Y:2012 09 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $2,244 Not Implemented
TT0092 # 08 Y:2012 08 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,500 $9,600 Implemented
TT0092 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,365 $100 Not Implemented
TT0092 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,476 $736 Not Implemented
TT0092 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $298 $20 Not Implemented
TT0092 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,171 $3,000 Implemented
TT0092 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $1,269 $50 Not Implemented
TT0092 # 01 Y:2012 01 2012 REPAIR OR REPLACE STEAM TRAPS $18,416 $2,040 Implemented
TT0062 # 11 Y:2011 11 2011 REPLACE DIRECT FIRED WITH STEAM HEAT $78,600 $30,000 Implemented
TT0062 # 09 Y:2011 09 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $23,000 $50,000 Not Implemented
TT0062 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,100 $4,900 Not Implemented
TT0062 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,800 $26,000 Implemented
TT0062 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $1,500 Implemented
TT0062 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,600 $4,200 Implemented
TT0062 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,100 $6,300 Implemented