IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
Reset
NAICS 325180 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0589 # 05 Y:2025 05 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,588 $5,000 n/a
LE0589 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,173 $4,403 n/a
LE0589 # 04 Y:2025 04 2025 INSTALL OCCUPANCY SENSORS $651 $1,275 n/a
LE0589 # 07 Y:2025 07 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,206 $19,974 n/a
LE0589 # 01 Y:2025 01 2025 INSTALL BACK-UP EQUIPMENT $125,769 $50,000 n/a
LE0589 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,428 $3,300 n/a
LE0589 # 03 Y:2025 03 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,179 $800 n/a
UU0258 # 03 Y:2024 03 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $12,600 $54,500 n/a
UU0258 # 08 Y:2024 08 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $180,000 $20,000 n/a
UU0258 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $158,000 $725,000 n/a
UU0258 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,890 $11,500 n/a
UU0258 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,570 $5,140 n/a
UU0258 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $120,000 $198,000 n/a
UU0258 # 04 Y:2024 04 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,690,000 $23,500,000 n/a
UU0258 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $25,800 $6,200 n/a
LS2406 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,003 $50 Implemented
LS2406 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,460 $11,500 Not Implemented
LS2406 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,468 $750 Not Implemented
LS2406 # 03 Y:2024 03 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $9,410 $28,500 Implemented
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 n/a
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 n/a
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 n/a
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 n/a
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 n/a
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 n/a