IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
Reset
NAICS 325180 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0516 # 02 Y:2006 02 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,494 $12,000 Implemented
AM0516 # 03 Y:2006 03 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $30,123 $12,050 Implemented
AM0516 # 04 Y:2006 04 2006 REPAIR AND ELIMINATE STEAM LEAKS $4,570 $1,000 Implemented
AM0516 # 05 Y:2006 05 2006 PAY UTILITY BILLS ON TIME $673 $0 Not Implemented
AM0516 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $430 $0 Implemented
AS0427 # 01 Y:2006 01 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $53,975 $63,819 n/a
AS0427 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,093 $1,000 n/a
AS0427 # 03 Y:2006 03 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,465 $10,000 n/a
AS0427 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,236 $20,867 n/a
AS0427 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,551 $2,513 n/a
AS0427 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $933 $8,000 n/a
AS0427 # 07 Y:2006 07 2006 USE SOLAR HEAT TO HEAT WATER $904 $6,400 n/a
AS0427 # 08 Y:2006 08 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $576 $22,500 n/a
UD0743 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,328 $0 Implemented
UD0743 # 05 Y:2006 05 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $54,177 $17,700 Not Implemented
UD0743 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,086 $100,000 Not Implemented
UD0743 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,904 $33,000 Not Implemented
UD0743 # 02 Y:2006 02 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $10,000 Not Implemented
UD0743 # 01 Y:2006 01 2006 ADD AREA LIGHTING SWITCHES $206,125 $12,880 Not Implemented
UD0743 # 13 Y:2006 13 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $8,946 $0 Not Implemented
UD0743 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $1,800 Implemented
UD0743 # 08 Y:2006 08 2006 REPAIR OR REPLACE STEAM TRAPS $18,000 $1,750 Implemented
UD0743 # 09 Y:2006 09 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $17,000 $0 Implemented
UD0743 # 10 Y:2006 10 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $15,000 $0 Implemented
UD0743 # 11 Y:2006 11 2006 USE OPTIMUM TEMPERATURE $13,681 $0 Not Implemented