Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 325180 | Other Basic Inorganic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0672 # 10 Y:2025 | 10 | 2025 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $43,311 | $4,700 | n/a |
SD0672 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,489 | $112,796 | n/a |
SD0672 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,678 | $2,631 | n/a |
SD0672 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $565 | $847 | n/a |
SD0672 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,349 | $0 | n/a |
SD0672 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,016 | $8,765 | n/a |
SD0672 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,804 | $3,518 | n/a |
SD0672 # 07 Y:2025 | 07 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,634 | $0 | n/a |
SD0672 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,315 | $2,000 | n/a |
SD0672 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,737 | $8,530 | n/a |
MZ0372 # 07 Y:2025 | 07 | 2025 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $32,864 | $8,100 | n/a |
MZ0372 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,800 | $19,900 | n/a |
MZ0372 # 05 Y:2025 | 05 | 2025 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $342,886 | $535,000 | n/a |
MZ0372 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,903 | $0 | n/a |
MZ0372 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,842 | $4,740 | n/a |
MZ0372 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $363 | $936 | n/a |
MZ0372 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,478 | $900 | n/a |
LS2510 # 07 Y:2025 | 07 | 2025 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,760 | $4,900 | n/a |
LS2510 # 08 Y:2025 | 08 | 2025 | REPLACE BOILER | $14,158 | $66,000 | n/a |
LS2510 # 06 Y:2025 | 06 | 2025 | ADJUST BURNERS FOR EFFICIENT OPERATION | $62,919 | $100,000 | n/a |
LS2510 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,682 | $21,000 | n/a |
LS2510 # 04 Y:2025 | 04 | 2025 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $24,480 | $14,000 | n/a |
LS2510 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,945 | $450 | n/a |
LS2510 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $287 | $50 | n/a |
LS2510 # 01 Y:2025 | 01 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,765 | $200 | n/a |