Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
470
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0632 # 10 Y:2025 | 10 | 2025 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,684 | $2,743 | n/a |
UF0632 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,170 | $6,785 | n/a |
UF0632 # 12 Y:2025 | 12 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $7,429 | $20,000 | n/a |
UF0632 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,170 | $2,654 | n/a |
UF0632 # 13 Y:2025 | 13 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,094 | $0 | n/a |
UF0632 # 11 Y:2025 | 11 | 2025 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,839 | $3,079 | n/a |
UF0632 # 14 Y:2025 | 14 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $1,115 | $3,888 | n/a |
UF0632 # 09 Y:2025 | 09 | 2025 | INSTALL TURBULATORS | $2,277 | $3,750 | n/a |
UF0632 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,200 | $2,000 | n/a |
UF0632 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,772 | $20,202 | n/a |
UF0632 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,631 | $322,608 | n/a |
UF0632 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,526 | $20,560 | n/a |
UF0632 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,911 | $34,076 | n/a |
UF0632 # 04 Y:2025 | 04 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,726 | $12,000 | n/a |
UC2419 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,596 | $0 | n/a |
UC2419 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $178 | $0 | n/a |
UC2419 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,510 | $2,929 | n/a |
UC2419 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $22,646 | $4,752 | n/a |
UC2419 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,548 | $10,295 | n/a |
UC2419 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $436 | $75 | n/a |
UC2419 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,471 | $776,252 | n/a |
UC2419 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,234 | $1,183 | n/a |
UC2419 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $149 | $390 | n/a |
IC0313 # 08 Y:2024 | 08 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $75,451 | $92,231 | Not Implemented |
IC0313 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,223 | $100,000 | Not Implemented |