IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

427

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0441 # 03 Y:2024 03 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,427 $1,306 n/a
MI0441 # 05 Y:2024 05 2024 USE SOLAR HEAT TO HEAT WATER $2,247 $2,602 n/a
MI0441 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,124 $1,980 n/a
MI0441 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $671 $1,203 n/a
MI0441 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $24,362 $840 n/a
MI0441 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,244 $186,000 n/a
MI0441 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,377 $510 n/a
CI0025 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,063 $212,582 n/a
CI0025 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,867 $7,205 n/a
CI0025 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,405 $0 n/a
CI0025 # 07 Y:2023 07 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,793 $100 n/a
CI0025 # 06 Y:2023 06 2023 USE PHOTOCELL CONTROLS $2,875 $2,520 n/a
CI0025 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,140 $17,500 n/a
CI0025 # 01 Y:2023 01 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $81,464 $500,000 n/a
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $343 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,354 $1,420 Implemented
OK1093 # 09 Y:2023 09 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,201 $632 Not Implemented
OK1093 # 10 Y:2023 10 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $31,034 $19,400 Not Implemented
OK1093 # 11 Y:2023 11 2023 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $98,980 $367,077 Implemented
OK1093 # 12 Y:2023 12 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,722 $300,000 Implemented
OK1093 # 13 Y:2023 13 2023 MAKE A NEW BY-PRODUCT $1,221,405 $1,600,000 Implemented
OK1093 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,678 $10,052 Implemented