Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
427
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1093 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,354 | $1,420 | Implemented |
OK1093 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,345 | $8,534 | Implemented |
UD1032 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,929 | $100,000 | Implemented |
UD1032 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,018 | $10,000 | Not Implemented |
UD1032 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,757 | $0 | Not Implemented |
UD1032 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,725 | $4,661 | Not Implemented |
UD1032 # 01 Y:2022 | 01 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $58,668 | $25,875 | Not Implemented |
UD1032 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,104 | $0 | Implemented |
UD1032 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $19,725 | $23,544 | Not Implemented |
UD1032 # 08 Y:2022 | 08 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $351,582 | $1,000,000 | Not Implemented |
NL0056 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,013 | $11,549 | Implemented |
NL0056 # 03 Y:2021 | 03 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $8,331 | $4,500 | Not Implemented |
NL0056 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,032 | $1,600 | Implemented |
NL0056 # 01 Y:2021 | 01 | 2021 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $222,300 | $82,500 | Implemented |
NL0056 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $1,169 | $770 | Implemented |
IP0121 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,859 | $3,200 | Not Implemented |
IP0121 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $4,725 | Implemented |
IP0121 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $5 | Not Implemented |
IP0121 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $662 | $23 | Implemented |
IP0121 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,721 | $260 | Implemented |
IP0121 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $252 | $476 | Implemented |
IP0121 # 08 Y:2019 | 08 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,512 | $9,313 | Not Implemented |
IP0121 # 09 Y:2019 | 09 | 2019 | REPLACE BOILER | $11,538 | $50,526 | Not Implemented |
IP0121 # 07 Y:2019 | 07 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,037 | $11,000 | Not Implemented |
IP0121 # 10 Y:2019 | 10 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,795 | $17,400 | Implemented |