IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

427

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS011 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $275,000 $500,000 Not Implemented
UMS011 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $196,000 $300,000 Not Implemented
UMS011 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $113,000 $70,000 Not Implemented
UMS011 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $200,000 Not Implemented
UMS011 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $40,000 $40,000 Not Implemented
NC0456 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $36,693 $65,000 Not Implemented
NC0456 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $34,238 $5,500 Implemented
NC0456 # 03 Y:2012 03 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,806 $60,000 Not Implemented
NC0456 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $100 Implemented
NC0456 # 05 Y:2012 05 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,045 $5,000 Not Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0450 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $141,590 $210,000 Not Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
WV0450 # 04 Y:2012 04 2012 REDESIGN PROCESS $102,043 $230,000 Not Implemented
WV0450 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $97,121 $400,000 Not Implemented
WV0450 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,667 $21,800 Not Implemented
WV0450 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,389 $6,500 Implemented
WV0450 # 08 Y:2012 08 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,199 $1,000 Not Implemented
WV0450 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,686 $21,120 Not Implemented
WV0450 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,953 $18,267 Implemented
WV0450 # 11 Y:2012 11 2012 DEVELOP A REPAIR/REPLACE POLICY $8,489 $1,210 Implemented
WV0450 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,314 $3,360 Not Implemented
WV0450 # 13 Y:2012 13 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $1,800 Not Implemented
GT0894 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $5,045 $0 Not Implemented
GT0894 # 02 Y:2012 02 2012 USE PHOTOCELL CONTROLS $235 $270 Not Implemented