IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0121 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $5 Not Implemented
IP0121 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $662 $23 Implemented
IP0121 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,721 $260 Implemented
IP0121 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,859 $3,200 Not Implemented
IP0121 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $252 $476 Implemented
IP0121 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $4,725 Implemented
IP0121 # 07 Y:2019 07 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,037 $11,000 Not Implemented
IP0121 # 08 Y:2019 08 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,512 $9,313 Not Implemented
IP0121 # 09 Y:2019 09 2019 REPLACE BOILER $11,538 $50,526 Not Implemented
IP0121 # 10 Y:2019 10 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,795 $17,400 Implemented
UM0481 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,978 $3,000 n/a
UM0481 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,854 $34,336 n/a
UM0481 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $18,599 $6,600 n/a
UM0481 # 04 Y:2017 04 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $50,498 $100,000 n/a