Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0750 # 10 Y:2006 | 10 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,730 | $20,000 | Not Implemented |
UD0750 # 09 Y:2006 | 09 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $24,000 | $13,000 | Implemented |
UD0750 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,020 | $135,999 | Not Implemented |
UD0750 # 07 Y:2006 | 07 | 2006 | USE OPTIMUM THICKNESS INSULATION | $41,225 | $39,892 | Not Implemented |
UD0750 # 06 Y:2006 | 06 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $44,000 | $25,000 | Implemented |
UD0750 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $56,000 | $0 | Not Implemented |
UD0750 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $79,000 | $45,000 | Implemented |
UD0750 # 03 Y:2006 | 03 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $155,000 | $187,200 | Implemented |
UD0750 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $226,890 | $120,000 | Implemented |
UD0750 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $273,386 | $100,000 | Not Implemented |
UD0745 # 12 Y:2006 | 12 | 2006 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $941 | $0 | Implemented |
UD0745 # 13 Y:2006 | 13 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $592 | $0 | Not Implemented |
UD0745 # 01 Y:2006 | 01 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,706 | $0 | Implemented |
UD0745 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,408 | $0 | Implemented |
UD0745 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,746 | $8,200 | Implemented |
UD0745 # 09 Y:2006 | 09 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $6,163 | $12,326 | Not Implemented |
UD0745 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,810 | $4,500 | Not Implemented |
UD0745 # 07 Y:2006 | 07 | 2006 | USE OPTIMUM THICKNESS INSULATION | $8,710 | $4,000 | Implemented |
UD0745 # 06 Y:2006 | 06 | 2006 | METER WASTE WATER | $10,810 | $0 | Not Implemented |
UD0745 # 05 Y:2006 | 05 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,968 | $500 | Not Implemented |
UD0745 # 04 Y:2006 | 04 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $11,027 | $30,000 | Not Implemented |
UD0745 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,936 | $18,000 | Not Implemented |
UD0745 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,807 | $34,035 | Implemented |