IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 325199 All Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0901 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,645 $1,000 Not Implemented
UD0901 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,379 $16,055 Not Implemented
UD0901 # 10 Y:2014 10 2014 REDUCE VENTILATION AIR $31,388 $33,025 Implemented
UD0901 # 09 Y:2014 09 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,267 $8,850 Not Implemented
UD0901 # 08 Y:2014 08 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,748 $1,000 Not Implemented
UD0901 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,426 $0 Not Implemented
UD0901 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $25,546 $28,000 Not Implemented
UD0901 # 05 Y:2014 05 2014 REDUCE FLUID FLOW RATES $151,019 $100,000 Implemented
UD0901 # 04 Y:2014 04 2014 RECOVER AND REUSE COOLING WATER $221,902 $100,000 Implemented
UD0901 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,149 $190 Not Implemented
UD0901 # 02 Y:2014 02 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,289 $800 Not Implemented
UD0750 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $273,386 $100,000 Not Implemented
UD0750 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,730 $20,000 Not Implemented
UD0750 # 09 Y:2006 09 2006 REPAIR AND ELIMINATE STEAM LEAKS $24,000 $13,000 Implemented
UD0750 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,020 $135,999 Not Implemented
UD0750 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $41,225 $39,892 Not Implemented
UD0750 # 06 Y:2006 06 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $44,000 $25,000 Implemented
UD0750 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,000 $0 Not Implemented
UD0750 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,000 $45,000 Implemented
UD0750 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $155,000 $187,200 Implemented
UD0750 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $226,890 $120,000 Implemented