IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 325199 All Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0537 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,747 $10,826 Not Implemented
NC0537 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,175 $20,000 Not Implemented
NC0537 # 08 Y:2015 08 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,635 $20,900 Not Implemented
NC0537 # 07 Y:2015 07 2015 INSULATE FEEDWATER TANK $1,506 $1,204 Implemented
NC0537 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,823 $4,175 Not Implemented
NC0537 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $850 Implemented
NC0537 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,614 $7,461 Not Implemented
NC0537 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,734 $1,041 Not Implemented
NC0537 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $3,462 Not Implemented
NC0490 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,689 $7,449 Not Implemented
NC0490 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,135 $2,192 Implemented
NC0490 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $3,207 $5,500 Implemented
NC0490 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,508 $1,217 Implemented
NC0490 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $50 Implemented
NC0490 # 05 Y:2013 05 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,690 $65,000 Implemented
NC0490 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,692 $1,922 Not Implemented
NC0490 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $213 $381 Implemented
NC0490 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,248 $4,989 Implemented