IAC Assessment: NC0537
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0537
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2015
Principal Product Polyacrylate polymers
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 45
Plant Area (Sq.Ft.) 65,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,197 4,245,443 kWh $0.04
Electricity Demand $91,494 8,119 kW-months/year $11.27
Electricity Fees $984 - $ -
Natural Gas $146,524 21,423 MMBtu $6.84
TOTAL ENERGY COSTS $409,199
RECOMMENDED SAVINGS* $28,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,747
Cost:
$10,826
$3,951 98,778 $1,674 135 - - - - $122 - $3,951
98,778
kWh
$1,674
135
kW-months/year
-
-
MMBtu
-
-
$
$122
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$524
Cost:
$3,462
$303 7,569 $128 10 - - - - $93 - $303
7,569
kWh
$128
10
kW-months/year
-
-
MMBtu
-
-
$
$93
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,734
Cost:
$1,041
$1,734 43,362 - - - - - - - - $1,734
43,362
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,614
Cost:
$7,461
$1,073 26,832 $910 74 - - - - $(-369) - $1,073
26,832
kWh
$910
74
kW-months/year
-
-
MMBtu
-
-
$
$(-369)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,200
Cost:
$850
$1,426 36,653 $604 49 - - $(-800) - $(-30) - $1,426
36,653
kWh
$604
49
kW-months/year
-
-
MMBtu
$(-800)
-
$
$(-30)
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,823
Cost:
$4,175
$1,983 49,582 $840 68 - - - - - - $1,983
49,582
kWh
$840
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$1,506
Cost:
$1,204
- - - - $1,506 220 - - - - -
-
kWh
-
-
kW-months/year
$1,506
220
MMBtu
-
-
$
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,635
Cost:
$20,900
$11,563 289,080 $5,280 528 $(-8,208) (-1,200) - - - - $11,563
289,080
kWh
$5,280
528
kW-months/year
$(-8,208)
(-1,200)
MMBtu
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,175
Cost:
$20,000
$3,854 96,360 $1,321 132 - - - - - - $3,854
96,360
kWh
$1,321
132
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,958
Cost:
$69,919
$25,887 648,216 $10,757 996 $(-6,702) (-980) $(-800) - $(-184) - $25,887
648,216
kWh
$10,757
996
kW-months/year
$(-6,702)
(-980)
MMBtu
$(-800)
-
$
$(-184)
-
$
TOTAL IMPLEMENTED Savings:
$2,706
Cost:
$2,054
$1,426 36,653 $604 49 $1,506 220 $(-800) - $(-30) - $1,426
36,653
kWh
$604
49
kW-months/year
$1,506
220
MMBtu
$(-800)
-
$
$(-30)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost