IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0559 # 03 Y:2016 03 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,003 $1,000 Implemented
NC0559 # 15 Y:2016 15 2016 DEVELOP A REPAIR/REPLACE POLICY $2,264 $4,256 Implemented
NC0559 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,085 $1,000 Implemented
NC0559 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $494 $347 Implemented
NC0559 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $1,339 $1,600 Implemented
NC0559 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $320 Implemented
NC0559 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,231 $2,000 Implemented
NC0559 # 07 Y:2016 07 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $34,146 $10,000 Implemented
NC0559 # 06 Y:2016 06 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,950 $25,000 Implemented
NC0559 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,787 $1,000 Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 11 Y:2010 11 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,625 $50,000 Implemented
NC0406 # 10 Y:2010 10 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $276,388 $214,700 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented