Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
29
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0277 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $104,870 | $6,974 | Not Implemented |
IC0277 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,159 | $20,704 | Not Implemented |
IC0277 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $81,821 | $1,271,713 | Not Implemented |
IC0277 # 04 Y:2023 | 04 | 2023 | OPERATE BOILERS ON HIGH FIRE SETTING | $6,360 | $36 | Not Implemented |
IC0277 # 03 Y:2023 | 03 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $8,672 | $1,280 | Implemented |
IC0277 # 10 Y:2023 | 10 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $391,650 | $2,055,740 | Not Implemented |
IC0277 # 09 Y:2023 | 09 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $7,769 | $36,842 | Not Implemented |
IC0277 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,974 | $5,963 | Implemented |
IC0277 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $5,585 | $3,405 | Implemented |
IC0277 # 01 Y:2023 | 01 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $64,155 | $52,421 | Not Implemented |
IP0126 # 05 Y:2019 | 05 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $37,555 | $12,740 | Not Implemented |
IP0126 # 10 Y:2019 | 10 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,441 | $2,582 | Not Implemented |
IP0126 # 09 Y:2019 | 09 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,752 | $1,356 | Not Implemented |
IP0126 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,365 | $941 | Not Implemented |
IP0126 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,116 | $1,932 | Not Implemented |
IP0126 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $73,256 | $43,486 | Not Implemented |
IP0126 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,865 | $93 | Not Implemented |
IP0126 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,500 | $125 | Not Implemented |
IP0126 # 02 Y:2019 | 02 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,594 | $0 | Not Implemented |
IP0126 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,811 | $0 | Not Implemented |
IC0089 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $67,444 | $15,000 | Not Implemented |
IC0089 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,590 | $2,400 | Not Implemented |
IC0089 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $643 | $0 | Not Implemented |
IC0089 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,592 | $15,794 | Not Implemented |
IC0089 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,900 | $0 | Not Implemented |