Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,185
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0284 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,202 | $2,331 | Implemented |
SF0284 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,933 | $12,763 | Implemented |
SF0284 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $5,065 | $3,065 | Not Implemented |
SF0284 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,841 | $8,312 | Not Implemented |
SF0284 # 07 Y:2004 | 07 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $39,674 | $43,664 | Not Implemented |
SF0284 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,661 | $1,900 | Not Implemented |
SF0284 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $554 | $1,152 | Not Implemented |
SF0284 # 10 Y:2004 | 10 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,103 | $50,000 | Not Implemented |
SF0284 # 11 Y:2004 | 11 | 2004 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $13,300 | $3,000 | Implemented |
NC0281 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,723 | $50 | Not Implemented |
NC0281 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,625 | $35,000 | Not Implemented |
NC0281 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,838 | $6,000 | Not Implemented |
NC0281 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,258 | $4,000 | Not Implemented |
NC0281 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,158 | $1,060 | Not Implemented |
NC0281 # 07 Y:2004 | 07 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $400 | Not Implemented |
NC0281 # 01 Y:2004 | 01 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $193,423 | $70,000 | Not Implemented |
LE0183 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $54,350 | $390,000 | n/a |
LE0183 # 02 Y:2004 | 02 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $49,237 | $10,000 | Implemented |
LE0183 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,090 | $7,000 | Not Implemented |
LE0183 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,113 | $2,497 | Not Implemented |
LE0183 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,591 | $750 | Not Implemented |
LE0183 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,467 | $500 | Not Implemented |
LE0183 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,086 | $21,041 | Not Implemented |
UM0244 # 01 Y:2003 | 01 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $101,745 | $30,000 | Not Implemented |
UM0244 # 02 Y:2003 | 02 | 2003 | SIZE TRUCKS TO JOB | $76,800 | $54,000 | Implemented |