IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,088

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0277 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,585 $3,405 Implemented
IC0277 # 03 Y:2023 03 2023 REPAIR AND ELIMINATE STEAM LEAKS $8,672 $1,280 Implemented
IC0277 # 04 Y:2023 04 2023 OPERATE BOILERS ON HIGH FIRE SETTING $6,360 $36 Not Implemented
IC0277 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $81,821 $1,271,713 Not Implemented
IC0277 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,159 $20,704 Not Implemented
IC0277 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $104,870 $6,974 Not Implemented
IC0277 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,974 $5,963 Implemented
IC0277 # 09 Y:2023 09 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $7,769 $36,842 Not Implemented
IC0277 # 10 Y:2023 10 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $391,650 $2,055,740 Not Implemented
TT0285 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,659 $129,000 Not Implemented
TT0285 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,051 $12,000 Not Implemented
TT0285 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,920 $13,000 Implemented
TT0285 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,364 $55,000 Not Implemented
TT0285 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,293 $3,600 Implemented
TT0285 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,020 $33,675 Not Implemented
TT0285 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,451 $1,225 Implemented
TT0285 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $616 $2,793 Implemented
DL0213 # 04 Y:2022 04 2022 REPAIR OR REPLACE STEAM TRAPS $92,874 $102,000 Implemented
DL0213 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,425 $18,000 Not Implemented
DL0213 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $50,015 $22,860 Not Implemented
DL0213 # 01 Y:2022 01 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $81,353 $115,000 Implemented
MZ0332 # 08 Y:2022 08 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,961 $200,000 Implemented
MZ0332 # 07 Y:2022 07 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,524 $7,544 Not Implemented
MZ0332 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,198 $720 Not Implemented
MZ0332 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $506 $780 Not Implemented