IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0202 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $699 $0 Not Implemented
WM0202 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,708 $2,511 Implemented
WM0202 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,975 $5,360 Implemented
WM0202 # 01 Y:2023 01 2023 USE SYNTHETIC LUBRICANT $14,553 $24,000 Not Implemented
WM0202 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,460 $0 Not Implemented
WM0202 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,098 $13,750 Implemented
WM0150 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,170 $570 Not Implemented
WM0150 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,191 $3,200 Not Implemented
WM0150 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $675 Not Implemented
WM0150 # 04 Y:2019 04 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,791 $700 Not Implemented
WM0150 # 02 Y:2019 02 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,677 $3,000 Not Implemented
WM0150 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $980 $1,950 Not Implemented
WM0150 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,749 $27,082 Not Implemented
WM0121 # 17 Y:2018 17 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $385 Implemented
WM0121 # 16 Y:2018 16 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $799 $142 Implemented
WM0121 # 15 Y:2018 15 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $838 $1,160 Implemented
WM0121 # 03 Y:2018 03 2018 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,239 $23,000 Not Implemented
WM0121 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,055 $52,350 Not Implemented
WM0121 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,568 $12,240 Implemented
WM0121 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $10,644 $10,926 Implemented
WM0121 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,876 $3,060 Not Implemented
WM0121 # 08 Y:2018 08 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,741 $7,920 Implemented
WM0121 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,083 $4,115 Not Implemented
WM0121 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $2,330 Implemented
WM0121 # 11 Y:2018 11 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,374 $2,400 Not Implemented