Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0244 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,934 | $13,221 | Not Implemented |
UM0244 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $2,023 | $521 | Implemented |
UM0244 # 04 Y:2003 | 04 | 2003 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,499 | $51,860 | Not Implemented |
UM0244 # 03 Y:2003 | 03 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $582 | $2,477 | Not Implemented |
UM0244 # 02 Y:2003 | 02 | 2003 | SIZE TRUCKS TO JOB | $76,800 | $54,000 | Implemented |
UM0244 # 01 Y:2003 | 01 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $101,745 | $30,000 | Not Implemented |
UF0326 # 01 Y:2003 | 01 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $136,220 | $60,000 | Not Implemented |
UF0326 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $48,872 | $32,000 | Not Implemented |
UF0326 # 06 Y:2003 | 06 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,783 | $0 | Implemented |
UF0326 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,967 | $8,000 | Not Implemented |
UF0326 # 04 Y:2003 | 04 | 2003 | INSTALL STEAM TRAP | $5,631 | $238 | Implemented |
UF0326 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $3,682 | Not Implemented |
UF0326 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,941 | $1,860 | Not Implemented |
LL0158 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,145 | $11,600 | Implemented |
LL0158 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,000 | $420 | Implemented |
LL0158 # 05 Y:2003 | 05 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $116 | $226 | Implemented |
LL0158 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $1,303 | $164 | Implemented |
LL0158 # 03 Y:2003 | 03 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $16,068 | $5,800 | Implemented |
LL0158 # 02 Y:2003 | 02 | 2003 | USE PHOTOCELL CONTROLS | $16,687 | $2,262 | Not Implemented |
SU0159 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,028 | $0 | Implemented |
SU0159 # 05 Y:2003 | 05 | 2003 | REPLACE BOILER | $1,148 | $13,507 | Implemented |
SU0159 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,171 | $0 | Implemented |
SU0159 # 03 Y:2003 | 03 | 2003 | USE SYNTHETIC LUBRICANT | $1,187 | $800 | Implemented |
SU0159 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,575 | $15,750 | Not Implemented |
SU0159 # 01 Y:2003 | 01 | 2003 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,869 | $18,122 | Not Implemented |