IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0213 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $50,015 $22,860 Not Implemented
DL0213 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,425 $18,000 Not Implemented
DL0213 # 04 Y:2022 04 2022 REPAIR OR REPLACE STEAM TRAPS $92,874 $102,000 Implemented
DL0213 # 01 Y:2022 01 2022 ADJUST BURNERS FOR EFFICIENT OPERATION $81,353 $115,000 Implemented
MZ0332 # 08 Y:2022 08 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,961 $200,000 Implemented
MZ0332 # 07 Y:2022 07 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,524 $7,544 Not Implemented
MZ0332 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,198 $720 Not Implemented
MZ0332 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $506 $780 Not Implemented
MZ0332 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,330 Implemented
MZ0332 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,554 $7,980 Not Implemented
MZ0332 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $87,851 $670,334 Not Implemented
MZ0332 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,571 $18,580 Implemented
LS2216 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $1,095 $350 Implemented
LS2216 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,044 $18,502 Implemented
LS2216 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $42 $50 Not Implemented
LS2216 # 07 Y:2022 07 2022 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $50,000 $64,300 Not Implemented
LS2216 # 08 Y:2022 08 2022 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $49,168 $91,825 Not Implemented
LS2216 # 09 Y:2022 09 2022 USE EVAPORATION TO CONCENTRATE MATERIAL $104,200 $500,000 Not Implemented
LS2216 # 03 Y:2022 03 2022 USE PHOTOCELL CONTROLS $251 $74 Implemented
LS2216 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,917 $450 Not Implemented
LS2216 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,899 $150 Not Implemented
TT0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,947 $60,000 Not Implemented
TT0268 # 02 Y:2022 02 2022 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $17,027 $10,000 Not Implemented
TT0268 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,583 $49,071 Not Implemented
TT0268 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,268 $3,480 Not Implemented