Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0213 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $50,015 | $22,860 | Not Implemented |
DL0213 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,425 | $18,000 | Not Implemented |
DL0213 # 04 Y:2022 | 04 | 2022 | REPAIR OR REPLACE STEAM TRAPS | $92,874 | $102,000 | Implemented |
DL0213 # 01 Y:2022 | 01 | 2022 | ADJUST BURNERS FOR EFFICIENT OPERATION | $81,353 | $115,000 | Implemented |
MZ0332 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,961 | $200,000 | Implemented |
MZ0332 # 07 Y:2022 | 07 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,524 | $7,544 | Not Implemented |
MZ0332 # 06 Y:2022 | 06 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,198 | $720 | Not Implemented |
MZ0332 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $506 | $780 | Not Implemented |
MZ0332 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,330 | Implemented |
MZ0332 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,554 | $7,980 | Not Implemented |
MZ0332 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,851 | $670,334 | Not Implemented |
MZ0332 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,571 | $18,580 | Implemented |
LS2216 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $1,095 | $350 | Implemented |
LS2216 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,044 | $18,502 | Implemented |
LS2216 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $42 | $50 | Not Implemented |
LS2216 # 07 Y:2022 | 07 | 2022 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $50,000 | $64,300 | Not Implemented |
LS2216 # 08 Y:2022 | 08 | 2022 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $49,168 | $91,825 | Not Implemented |
LS2216 # 09 Y:2022 | 09 | 2022 | USE EVAPORATION TO CONCENTRATE MATERIAL | $104,200 | $500,000 | Not Implemented |
LS2216 # 03 Y:2022 | 03 | 2022 | USE PHOTOCELL CONTROLS | $251 | $74 | Implemented |
LS2216 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,917 | $450 | Not Implemented |
LS2216 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,899 | $150 | Not Implemented |
TT0268 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,947 | $60,000 | Not Implemented |
TT0268 # 02 Y:2022 | 02 | 2022 | REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS | $17,027 | $10,000 | Not Implemented |
TT0268 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $14,583 | $49,071 | Not Implemented |
TT0268 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,268 | $3,480 | Not Implemented |