IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

419

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0105 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $17,271 $3,900 Implemented
AM0494 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $14,700 $5,000 Implemented
AM0494 # 02 Y:2005 02 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,880 $540 Implemented
AM0494 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,400 $500 Implemented
AM0494 # 04 Y:2005 04 2005 REPAIR OR REPLACE STEAM TRAPS $4,450 $800 Implemented
AM0494 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $9,160 Implemented
AM0494 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $12 Implemented
AM0494 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $870 $0 Implemented
AM0494 # 10 Y:2005 10 2005 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $770 $660 Implemented
AM0494 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $230 $200 Implemented
WI0490 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,000 $1,000 Implemented
WI0490 # 06 Y:2005 06 2005 IMPROVE LUBRICATION PRACTICES $538 $1,165 Implemented
WI0490 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $361 $0 Implemented
WI0490 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $317 $227 Implemented
WI0490 # 09 Y:2005 09 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $316 $52 Implemented
LE0208 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $30,000 $2,500 Implemented
LE0208 # 03 Y:2005 03 2005 MOVE PRODUCT USING MECHANICAL MEANS $25,000 $460 Implemented
LE0208 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,745 $1,250 Implemented
LE0208 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,758 $2,500 Implemented
LE0208 # 06 Y:2005 06 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,676 $1,000 Implemented
LE0208 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,869 $750 Implemented
LE0208 # 09 Y:2005 09 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,060 $145 Implemented
MA0570 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $27,226 $1,624 Implemented
MA0570 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,028 $21,736 Implemented
MA0570 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,127 $30,357 Implemented