IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,034

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1062 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,486 $0 Not Implemented
UD1062 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $705 $260 Not Implemented
UD1062 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $952 Not Implemented
UD1062 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $0 Not Implemented
WV0650 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,505 $113,760 Not Implemented
WV0650 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,578 $21,335 Not Implemented
WV0650 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $10,058 $35,930 Implemented
WV0650 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,350 $15,114 Implemented
WV0650 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,595 $891 Implemented
WV0650 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,134 $21,176 Not Implemented
WV0650 # 07 Y:2023 07 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,598 $1,500 Implemented
WV0650 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,052 $8,935 Implemented
WV0650 # 09 Y:2023 09 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,956 $2,040 Not Implemented
WV0650 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $136 $388 Implemented
UL2304 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,568 $26,328 Implemented
UL2304 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $294,679 $268,088 Not Implemented
UL2304 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,148 $36,675 Not Implemented
UL2304 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,501 $89,882 Not Implemented
UL2304 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,246 $1,300 Implemented
UL2304 # 06 Y:2023 06 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $84,650 $36,445 Not Implemented
UL2304 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,731 $40,000 Not Implemented
WM0202 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $699 $0 Not Implemented
WM0202 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,708 $2,511 Implemented
WM0202 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,975 $5,360 Implemented
WM0202 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,460 $0 Not Implemented