IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0248 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,995 $4,980 n/a
DL0248 # 05 Y:2025 05 2025 USE OPTIMUM TEMPERATURE $1,534 $550 n/a
DL0248 # 04 Y:2025 04 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,139 $10,680 n/a
DL0248 # 03 Y:2025 03 2025 INSULATE BARE EQUIPMENT $5,964 $373 n/a
DL0248 # 07 Y:2025 07 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $736 n/a
DL0248 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,209 $291 n/a
DL0248 # 01 Y:2025 01 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,580 $0 n/a
DL0184 # 11 Y:2020 11 2020 REDUCE VENTILATION AIR $940 $0 Implemented
DL0184 # 12 Y:2020 12 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,215 $400 Implemented
DL0184 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $5,702 $0 Not Implemented
DL0184 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,700 $6,337 Not Implemented
DL0184 # 09 Y:2020 09 2020 USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER $240 $40 Not Implemented
DL0184 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $2,680 $152 Not Implemented
DL0184 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $800 $95 Not Implemented
DL0184 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $4,400 $4,750 Not Implemented
DL0184 # 05 Y:2020 05 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,500 $1,400 Not Implemented
DL0184 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $2,170 $4,250 Not Implemented
DL0184 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,300 $15,661 Implemented
DL0184 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,390 $3,079 Implemented
DL0174 # 08 Y:2017 08 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $630 $2,000 Not Implemented
DL0174 # 05 Y:2017 05 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,100 $10,000 Not Implemented
DL0174 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,500 $25,000 Not Implemented
DL0174 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,170 $4,000 Not Implemented
DL0174 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,710 $18,000 Not Implemented
DL0174 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,810 $6,000 Not Implemented