IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0628 # 02 Y:2025 02 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,459 $43,906 n/a
UF0628 # 10 Y:2025 10 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $514 $1,235 n/a
UF0628 # 09 Y:2025 09 2025 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,115 $1,235 n/a
UF0628 # 06 Y:2025 06 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,938 $0 n/a
UF0628 # 08 Y:2025 08 2025 UPGRADE CONTROLS ON COMPRESSORS $2,783 $6,000 n/a
UF0628 # 12 Y:2025 12 2025 IMPROVE SPACE COMFORT CONDITIONING $4,645 $1,476 n/a
UF0628 # 11 Y:2025 11 2025 IMPROVE SPACE COMFORT CONDITIONING $141,216 $3,660 n/a
UF0628 # 07 Y:2025 07 2025 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,937 $18,930 n/a
UF0628 # 03 Y:2025 03 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,464 $25,640 n/a
UF0628 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $45,801 $322,608 n/a
UF0628 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,671 $41,856 n/a
UF0628 # 05 Y:2025 05 2025 UPGRADE OBSOLETE EQUIPMENT $4,580 $16,608 n/a
UF0609 # 07 Y:2024 07 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $21,071 $25,000 Not Implemented
UF0609 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,116 $322,608 Implemented
UF0609 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,360 $25,380 Implemented
UF0609 # 06 Y:2024 06 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $35,940 $0 Implemented
UF0609 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,546 $9,000 Implemented
UF0609 # 04 Y:2024 04 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $14,767 $40,488 Not Implemented
UF0609 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,174 $25,504 Implemented
UF0520 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,699 $15,000 Implemented
UF0520 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $1,303 $2,207 Implemented
UF0520 # 03 Y:2018 03 2018 ISOLATE HOT OR COLD EQUIPMENT $5,366 $5,125 Not Implemented
UF0520 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $219,545 $970,000 Not Implemented
UF0520 # 06 Y:2018 06 2018 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $75,538 $33,400 Implemented
UF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $1,020 Implemented