Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0628 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,459 | $43,906 | n/a |
UF0628 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $514 | $1,235 | n/a |
UF0628 # 09 Y:2025 | 09 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,115 | $1,235 | n/a |
UF0628 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $0 | n/a |
UF0628 # 08 Y:2025 | 08 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,783 | $6,000 | n/a |
UF0628 # 12 Y:2025 | 12 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $4,645 | $1,476 | n/a |
UF0628 # 11 Y:2025 | 11 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $141,216 | $3,660 | n/a |
UF0628 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,937 | $18,930 | n/a |
UF0628 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,464 | $25,640 | n/a |
UF0628 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,801 | $322,608 | n/a |
UF0628 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,671 | $41,856 | n/a |
UF0628 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $4,580 | $16,608 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | Not Implemented |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | Implemented |
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | Implemented |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | Implemented |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | Implemented |
UF0609 # 04 Y:2024 | 04 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $14,767 | $40,488 | Not Implemented |
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | Implemented |
UF0520 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,699 | $15,000 | Implemented |
UF0520 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $2,207 | Implemented |
UF0520 # 03 Y:2018 | 03 | 2018 | ISOLATE HOT OR COLD EQUIPMENT | $5,366 | $5,125 | Not Implemented |
UF0520 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $219,545 | $970,000 | Not Implemented |
UF0520 # 06 Y:2018 | 06 | 2018 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $75,538 | $33,400 | Implemented |
UF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,084 | $1,020 | Implemented |