IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0244 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,221 Not Implemented
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
UM0244 # 04 Y:2003 04 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $51,860 Not Implemented
UM0244 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $582 $2,477 Not Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented
UM0244 # 01 Y:2003 01 2003 ADOPT IN-HOUSE MATERIAL GENERATION $101,745 $30,000 Not Implemented
UF0326 # 01 Y:2003 01 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $136,220 $60,000 Not Implemented
UF0326 # 07 Y:2003 07 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $48,872 $32,000 Not Implemented
UF0326 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,783 $0 Implemented
UF0326 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,967 $8,000 Not Implemented
UF0326 # 04 Y:2003 04 2003 INSTALL STEAM TRAP $5,631 $238 Implemented
UF0326 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $3,682 Not Implemented
UF0326 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,941 $1,860 Not Implemented
LL0158 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,145 $11,600 Implemented
LL0158 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,000 $420 Implemented
LL0158 # 05 Y:2003 05 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $116 $226 Implemented
LL0158 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,303 $164 Implemented
LL0158 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $16,068 $5,800 Implemented
LL0158 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $16,687 $2,262 Not Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,575 $15,750 Not Implemented
SU0159 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,869 $18,122 Not Implemented