Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1905 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,092 | $50 | Implemented |
LS1905 # 02 Y:2019 | 02 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,408 | $0 | Implemented |
LS1905 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,304 | $6,000 | Not Implemented |
LS1905 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,865 | $3,000 | Implemented |
LS1905 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,646 | $10,000 | Implemented |
OR0706 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $12,552 | $1,970 | Implemented |
OR0706 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,952 | $28,542 | Not Implemented |
OR0706 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,311 | $2,097 | Not Implemented |
OR0706 # 04 Y:2018 | 04 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,000 | $24,775 | Implemented |
OR0706 # 05 Y:2018 | 05 | 2018 | REDUCE FLUID FLOW RATES | $1,821 | $3,221 | Not Implemented |
OR0706 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $854 | $0 | Implemented |
UF0520 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $219,545 | $970,000 | Not Implemented |
UF0520 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,699 | $15,000 | Implemented |
UF0520 # 03 Y:2018 | 03 | 2018 | ISOLATE HOT OR COLD EQUIPMENT | $5,366 | $5,125 | Not Implemented |
UF0520 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $2,207 | Implemented |
UF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,084 | $1,020 | Implemented |
UF0520 # 06 Y:2018 | 06 | 2018 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $75,538 | $33,400 | Implemented |
WM0121 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,154 | $54,000 | Not Implemented |
WM0121 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,043 | $20,000 | Implemented |
WM0121 # 03 Y:2018 | 03 | 2018 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $25,239 | $23,000 | Not Implemented |
WM0121 # 04 Y:2018 | 04 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,055 | $52,350 | Not Implemented |
WM0121 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,568 | $12,240 | Implemented |
WM0121 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $10,644 | $10,926 | Implemented |
WM0121 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,876 | $3,060 | Not Implemented |
WM0121 # 08 Y:2018 | 08 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,741 | $7,920 | Implemented |