IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

945

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0089 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,176 $1,000 Not Implemented
IC0089 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,684 $90,950 Not Implemented
IC0089 # 09 Y:2004 09 2004 UPGRADE OBSOLETE EQUIPMENT $509 $1,484 Not Implemented
AM0475 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $19,000 $650 Implemented
AM0475 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,800 $700 Implemented
AM0475 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,390 $500 Implemented
AM0475 # 04 Y:2004 04 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,170 $4,600 Not Implemented
AM0475 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $300 Implemented
AM0475 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,020 $33 Implemented
AM0475 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,290 $400 Not Implemented
AM0475 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,490 $900 Implemented
AM0475 # 09 Y:2004 09 2004 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,600 $12,500 Not Implemented
AM0475 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,740 $425 Implemented
AM0475 # 11 Y:2004 11 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $572 $699 Not Implemented
AM0475 # 12 Y:2004 12 2004 INSULATE BARE EQUIPMENT $450 $60 Not Implemented
UF0350 # 01 Y:2004 01 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $22,657 $60,000 Not Implemented
UF0350 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,654 $10,151 Implemented
UF0350 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $17,652 $1,339 Not Implemented
UF0350 # 04 Y:2004 04 2004 INSTALL SKYLIGHTS $12,961 $9,706 Implemented
UF0350 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,068 $1,610 Implemented
UF0350 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $563 $1,750 Not Implemented
UF0350 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,988 $0 Not Implemented
UF0350 # 08 Y:2004 08 2004 RECYCLE FLUORESCENT LAMPS $1,968 $3,496 Not Implemented
UF0350 # 09 Y:2004 09 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,200 $0 Not Implemented
UF0350 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,795 $3,000 Implemented