Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0287 # 01 Y:2004 | 01 | 2004 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $10,282 | $9,879 | Not Implemented |
NC0287 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,536 | $1,096 | Not Implemented |
NC0287 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $615 | $100 | Implemented |
NC0287 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,732 | $700 | Implemented |
NC0287 # 05 Y:2004 | 05 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,915 | $750 | Implemented |
NC0287 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $803 | $1,570 | Not Implemented |
LE0196 # 01 Y:2004 | 01 | 2004 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,437 | $239,000 | Not Implemented |
LE0196 # 02 Y:2004 | 02 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $27,869 | $27,000 | Not Implemented |
LE0196 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,639 | $5,000 | Implemented |
LE0196 # 04 Y:2004 | 04 | 2004 | MINIMIZE WATER USAGE | $16,092 | $2,000 | Not Implemented |
LE0196 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,917 | $57,000 | Implemented |
LE0196 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,457 | $0 | Implemented |
LE0196 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $9,536 | $8,000 | Not Implemented |
LE0196 # 08 Y:2004 | 08 | 2004 | OPTIMIZE PLANT POWER FACTOR | $7,875 | $11,050 | Not Implemented |
LE0196 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,088 | $0 | Implemented |
SF0284 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $46,318 | $4,640 | Not Implemented |
SF0284 # 02 Y:2004 | 02 | 2004 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,601 | $3,625 | Not Implemented |
SF0284 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,202 | $2,331 | Implemented |
SF0284 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,933 | $12,763 | Implemented |
SF0284 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $5,065 | $3,065 | Not Implemented |
SF0284 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,841 | $8,312 | Not Implemented |
SF0284 # 07 Y:2004 | 07 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $39,674 | $43,664 | Not Implemented |
SF0284 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,661 | $1,900 | Not Implemented |
SF0284 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $554 | $1,152 | Not Implemented |
SF0284 # 10 Y:2004 | 10 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,103 | $50,000 | Not Implemented |