IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0609 # 06 Y:2024 06 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $35,940 $0 n/a
UF0609 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,546 $9,000 n/a
UF0609 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,116 $322,608 n/a
UF0609 # 04 Y:2024 04 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $14,767 $40,488 n/a
UF0609 # 07 Y:2024 07 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $21,071 $25,000 n/a
UF0609 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,174 $25,504 n/a
UF0609 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,360 $25,380 n/a
UF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $1,020 Implemented
UF0520 # 06 Y:2018 06 2018 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $75,538 $33,400 Implemented
UF0520 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $219,545 $970,000 Not Implemented
UF0520 # 03 Y:2018 03 2018 ISOLATE HOT OR COLD EQUIPMENT $5,366 $5,125 Not Implemented
UF0520 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $1,303 $2,207 Implemented
UF0520 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,699 $15,000 Implemented
UF0505 # 03 Y:2017 03 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $18,902 $2,800 Implemented
UF0505 # 08 Y:2017 08 2017 REPAIR AND ELIMINATE STEAM LEAKS $4,554 $1,592 Implemented
UF0505 # 07 Y:2017 07 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,374 $4,000 Not Implemented
UF0505 # 06 Y:2017 06 2017 REPAIR AND ELIMINATE STEAM LEAKS $7,831 $1,081 Implemented
UF0505 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $715,231 $1,700,000 Not Implemented
UF0505 # 02 Y:2017 02 2017 REPLACE BOILER $152,736 $200,000 Implemented
UF0505 # 04 Y:2017 04 2017 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $13,763 $120 Implemented
UF0505 # 05 Y:2017 05 2017 INSTALL TURBULATORS $12,705 $7,500 Not Implemented
MI0223 # 11 Y:2012 11 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $401 $1,103 Implemented
MI0223 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,364 $5,920 Not Implemented
MI0223 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,824 $4,510 Implemented
MI0223 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented