IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0229 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,286 $15,316 Implemented
IC0229 # 05 Y:2019 05 2019 OPERATE DISTILLATION COLUMNS EFFICIENTLY $20,792 $12,047 Not Implemented
IC0229 # 04 Y:2019 04 2019 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,133 $2,010 Implemented
IC0229 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,701 $2,326 Implemented
IC0229 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $1,024 $1,131 Implemented
IC0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $4,200 Implemented
WM0088 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,075 $501 Not Implemented
WM0088 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $75,376 $50,000 Not Implemented
WM0088 # 05 Y:2016 05 2016 METER WASTE WATER $4,267 $375 Not Implemented
WM0088 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,245 $0 Implemented
WM0088 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,531 $6,000 Not Implemented
WM0088 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $71,275 $132,797 Not Implemented
WM0088 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,940 $28,000 Not Implemented
MZ0160 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,778 $7,000 Not Implemented
MZ0160 # 10 Y:2014 10 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,172 $24,000 Not Implemented
MZ0160 # 09 Y:2014 09 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,495 $0 Not Implemented
MZ0160 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,719 $74,400 Implemented
MZ0160 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,000 $15,000 Not Implemented
MZ0160 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $7,727 $0 Not Implemented
MZ0160 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,300 $5,000 Implemented
MZ0160 # 03 Y:2014 03 2014 REPLACE BOILER $32,000 $65,000 Not Implemented
MZ0160 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,436 $24,000 Not Implemented
MZ0160 # 04 Y:2014 04 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $47,644 $117,000 Not Implemented
IC0160 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,043 $345 Implemented
IC0160 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,221 $42,838 Implemented