IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
NAICS 325212 Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1036 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $36 $146 n/a
CM1036 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $204 $796 n/a
CM1036 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $800 $12,180 n/a
CM1036 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,289 $11,963 n/a
CM1036 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,303 $55,212 n/a
CM1036 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $116 n/a
CM1036 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $155 $428 n/a
LS2417 # 01 Y:2024 01 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,135 $75 Implemented
LS2417 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $63,875 $514,800 Not Implemented
LS2417 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,694 $120,300 Not Implemented
LS2417 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $9,379 $28,000 Not Implemented
LS2417 # 04 Y:2024 04 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $182,554 $481,830 Not Implemented
LS2417 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,069 $99,800 Not Implemented
LS2417 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,173 $90 Not Implemented
MS0431 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $57,233 $175,000 n/a
MS0431 # 03 Y:2024 03 2024 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $2,111 $124,000 n/a
MS0431 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $60,065 $1,274,840 n/a
GT0971 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,384 $400 Not Implemented
GT0971 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,705 $17,982 Not Implemented
GT0971 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $137,329 $2,565,299 Not Implemented
GT0971 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,890 $1,850 Not Implemented
GT0971 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,632 $867 Not Implemented
GT0971 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,025 $5,227 Not Implemented
UL2304 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $294,679 $268,088 Not Implemented
UL2304 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,568 $26,328 Implemented