IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 32522 Artificial and Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0392 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $486 Not Implemented
UF0392 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $238 $228 Not Implemented
UF0392 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $2,922 $1,680 Not Implemented
UF0392 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $8,824 Implemented
UF0392 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,532 $585 Implemented
UF0392 # 02 Y:2006 02 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $28,316 $138,000 Not Implemented
UF0392 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $32,112 $2,775 Implemented
AS0430 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,545 $7,500 Implemented
AS0430 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $136,800 $2 Not Implemented
AS0430 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $1,000 Not Implemented
AS0430 # 04 Y:2006 04 2006 INSTALL SKYLIGHTS $782 $4,400 Implemented
AS0430 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3 $1,077 Implemented
LE0243 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,687 $7,500 Not Implemented
LE0243 # 02 Y:2006 02 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $28,291 $86,000 Not Implemented
LE0243 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $995 $525 Not Implemented
LE0243 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,925 $2,000 Not Implemented
LE0243 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,824 $80 Not Implemented
LE0243 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $8,730 $2,400 Not Implemented
LE0243 # 05 Y:2006 05 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $18,286 $50,000 Not Implemented
LE0243 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $27,306 $200 Not Implemented
LE0243 # 03 Y:2006 03 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,533 $20,000 Not Implemented
LE0243 # 01 Y:2006 01 2006 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $193,808 $200,000 Not Implemented
UF0380 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,443 $1,104 Not Implemented
UF0380 # 02 Y:2006 02 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $886 $0 Not Implemented
UF0380 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $961 $353 Not Implemented