IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0158 # 04 Y:2016 04 2016 UPGRADE OBSOLETE EQUIPMENT $13,830 $11,600 Not Implemented
DL0158 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $310,823 $38,750 Implemented
DL0158 # 05 Y:2016 05 2016 REDUCE HEAT GAIN BY WINDOW TINTING $54,090 $104,500 Implemented
DL0158 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,940 $1,480 Not Implemented
DL0158 # 08 Y:2016 08 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,534 $96,100 Implemented
DL0158 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $1,270 $60 Not Implemented
DL0158 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,070 $380,000 Implemented
DL0158 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,560 $331,000 Not Implemented
DL0102 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $31,820 $3,200 Implemented
DL0102 # 05 Y:2013 05 2013 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,300 $37,600 Not Implemented
DL0102 # 02 Y:2013 02 2013 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $25,460 $100 Implemented
DL0102 # 03 Y:2013 03 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,740 $100 Not Implemented
DL0102 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,500 $510 Not Implemented
DL0102 # 06 Y:2013 06 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $185 Not Implemented
DL0062 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,400 $15,300 Not Implemented
DL0062 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,900 $30 Implemented
DL0062 # 10 Y:2010 10 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,200 $2,500 Not Implemented
DL0062 # 11 Y:2010 11 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,800 $10,000 Not Implemented
DL0062 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $233 $970 Not Implemented
DL0062 # 01 Y:2010 01 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,000 $2,500 Not Implemented
DL0062 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,000 $15,930 Not Implemented
DL0062 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,000 $6,300 Not Implemented
DL0062 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $5,000 Implemented
DL0062 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,200 $10,000 Not Implemented
DL0062 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $649 $1,331 Not Implemented