IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0395 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $811 Implemented
MI0395 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,523 $1,980 Implemented
MI0395 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,790 $1,380 Implemented
MI0395 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $613 $255 Implemented
MI0364 # 02 Y:2019 02 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,750 $35,446 Implemented
MI0364 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,252 $23,997 Implemented
MI0364 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $10,631 $3,600 Implemented
MI0364 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $5,164 $16,940 Implemented
MI0364 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $38,687 $109,552 Implemented
MI0348 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $7,601 Implemented
MI0348 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,851 $3,229 Implemented
MI0348 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $3,201 $750 Implemented
MI0348 # 03 Y:2019 03 2019 UPGRADE OBSOLETE EQUIPMENT $12,811 $30,000 Implemented
MI0348 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,401 $2,020 Implemented
MI0348 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,411 $167,280 Implemented
MI0348 # 10 Y:2019 10 2019 INSULATE BARE EQUIPMENT $288 $507 Implemented
MI0256 # 02 Y:2014 02 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $23,626 $13,599 Implemented
MI0256 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,420 $1,660 Implemented
MI0256 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,619 $80 Implemented
MI0256 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,196 $3,960 Implemented
MI0256 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,634 $80 Implemented
MI0253 # 05 Y:2013 05 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,448 $1,680 Implemented
MI0253 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,154 $52,122 Implemented
MI0253 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53,448 $80 Implemented
MI0253 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,576 $80 Implemented