Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,118
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0677 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,718 | $0 | n/a |
SD0677 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,402 | $4,350 | n/a |
SD0677 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,337 | $2,362 | n/a |
SD0677 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,986 | $59,050 | n/a |
SD0677 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,175 | $5,179 | n/a |
SD0677 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $10,792 | $133,100 | n/a |
SD0677 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $22,813 | $1,191 | n/a |
SD0677 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,908 | $11,010 | n/a |
UF0629 # 05 Y:2025 | 05 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,706 | $754 | n/a |
UF0629 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $342 | n/a |
UF0629 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,163 | $0 | n/a |
UF0629 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,690 | $322,608 | n/a |
UF0629 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,163 | $14,913 | n/a |
UF0629 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,103 | $455 | n/a |
UF0629 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,977 | $47,000 | n/a |
UF0629 # 04 Y:2025 | 04 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,306 | $25,400 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,094 | $2,000 | n/a |
UF0627 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,019 | $2,949 | n/a |
UF0627 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $19,980 | $20,761 | n/a |
UF0627 # 08 Y:2025 | 08 | 2025 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $41,600 | $98,000 | n/a |
UF0627 # 05 Y:2025 | 05 | 2025 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $3,491 | $0 | n/a |
UF0627 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,567 | $9,248 | n/a |
UF0627 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $8,759 | $32,640 | n/a |
UC2502 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,276 | $0 | n/a |