IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0300 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $37,529 $0 Implemented
MI0300 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,599 $40 Implemented
MI0300 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,521 $1,660 Implemented
MI0300 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,807 $22,446 Implemented
MI0300 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $7,917 $1,281 Implemented
MI0300 # 13 Y:2016 13 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,924 $40 Implemented
MI0300 # 14 Y:2016 14 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,797 $2,520 Implemented
MI0300 # 16 Y:2016 16 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $849 $29 Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
LE0414 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,057 $0 Implemented
LE0414 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $34,860 $36,000 Implemented
LE0414 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $14,625 Implemented
LE0414 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,482 $10,500 Implemented
LE0414 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $1,140 Implemented
DL0158 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $310,823 $38,750 Implemented
DL0158 # 05 Y:2016 05 2016 REDUCE HEAT GAIN BY WINDOW TINTING $54,090 $104,500 Implemented
DL0158 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,070 $380,000 Implemented
DL0158 # 08 Y:2016 08 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,534 $96,100 Implemented
UA0148 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $10,764 $14,137 Implemented
UA0148 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,529 $1,740 Implemented
UM0458 # 01 Y:2015 01 2015 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,036 $0 Implemented
SD0500 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $326,647 $943,500 Implemented
SD0500 # 02 Y:2015 02 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $105,336 $417,200 Implemented