IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0062 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,000 $6,300 Not Implemented
DL0062 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,000 $15,930 Not Implemented
DL0053 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $55,000 $10,000 Not Implemented
DL0053 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $358,000 $4,000 Implemented
DL0053 # 02 Y:2010 02 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $142,000 $760 Not Implemented
DL0053 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $123,000 $29,200 Implemented
DL0053 # 04 Y:2010 04 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $58,000 $60,000 Implemented
DL0053 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80,000 $30,000 Implemented
DL0053 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,000 $700 Implemented
DL0053 # 08 Y:2010 08 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,000 $20 Implemented
DL0053 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40,900 $10,240 Implemented
DL0053 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,000 $1,920 Not Implemented
DL0053 # 11 Y:2010 11 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,000 $10 Implemented
DL0053 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,100 $500 Not Implemented
DL0053 # 13 Y:2010 13 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,600 $100 Implemented
DL0053 # 14 Y:2010 14 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $18,000 $8,600 Implemented
DL0053 # 15 Y:2010 15 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,000 $31,440 Implemented
DL0028 # 02 Y:2008 02 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $47,800 $15,000 Implemented
DL0028 # 03 Y:2008 03 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,400 $5,000 Not Implemented
DL0028 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,700 $3,000 Implemented
DL0028 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,900 $2,520 Implemented
DL0028 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,080 $500 Not Implemented
DL0028 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,100 $12,000 Not Implemented
DL0028 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,290 $12,000 Implemented
DL0028 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,400 $400 Implemented