IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,073

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
IC0141 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $59,840 $25,152 Not Implemented
IC0141 # 10 Y:2008 10 2008 REPAIR OR REPLACE STEAM TRAPS $19,800 $17,250 Not Implemented
IC0141 # 11 Y:2008 11 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,748 $180,000 Not Implemented
MI0162 # 01 Y:2008 01 2008 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $1,069,901 $2,000,000 Not Implemented
MI0162 # 02 Y:2008 02 2008 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $98,398 $18,460 Implemented
MI0162 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,183 $45,980 Not Implemented
MI0162 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $73,832 $1,750 Implemented
MI0162 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $61,527 $56,000 Not Implemented
MI0162 # 06 Y:2008 06 2008 REPAIR OR REPLACE STEAM TRAPS $11,109 $400 Implemented
MI0162 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,769 $1,210 Implemented
MI0162 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,419 $4,800 Not Implemented
MI0162 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,630 $40 Implemented
NC0370 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $30,975 $65,000 Not Implemented
NC0370 # 02 Y:2007 02 2007 REPAIR OR REPLACE STEAM TRAPS $43,809 $17,100 Not Implemented
NC0370 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $48,420 $25,000 Not Implemented
NC0370 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $27,567 $74,816 Not Implemented
NC0370 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $45,052 $88,200 Not Implemented
NC0370 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $74,891 $121,780 Not Implemented
NC0370 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $87,257 $136,000 Not Implemented
NC0370 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,768 $120,500 Not Implemented
NC0370 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,690 $50 Not Implemented
NC0370 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $7,240 Not Implemented
IA0411 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,897 $28,132 Implemented