IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,078

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0340 # 15 Y:2007 15 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,697 $37,793 Implemented
SF0340 # 16 Y:2007 16 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,354 $70,400 Implemented
SF0340 # 17 Y:2007 17 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $6,224 Not Implemented
SF0340 # 18 Y:2007 18 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,904 $16,738 Not Implemented
UF0397 # 01 Y:2007 01 2007 INSTALL SET-BACK TIMERS $504 $144 Implemented
UF0397 # 02 Y:2007 02 2007 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $5,429 $12,800 Implemented
UF0397 # 03 Y:2007 03 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,655 $1,826 Not Implemented
UF0397 # 04 Y:2007 04 2007 REDESIGN PROCESS $10,558 $8,150 Not Implemented
UF0397 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $590 Implemented
UF0397 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $0 Implemented
UF0397 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $6,526 Implemented
UF0397 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,504 $894 Not Implemented
UF0397 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $945 $1,521 Not Implemented
SF0337 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,667 $0 Implemented
SF0337 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,318 $20,000 Not Implemented
SF0337 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $1,729 $937 Implemented
SF0337 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,650 $3,344 Implemented
SF0337 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $3,510 Implemented
SF0337 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,179 $3,376 Implemented
SF0337 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $929 $3,460 Not Implemented
SF0336 # 01 Y:2006 01 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16 $0 Implemented
SF0336 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $202 $0 Implemented
SF0336 # 03 Y:2006 03 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $882 $24,000 Not Implemented
SF0336 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $5,934 Not Implemented
SF0336 # 05 Y:2006 05 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,164 $15,000 Not Implemented