Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,078
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0336 # 06 Y:2006 | 06 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31 | $29,700 | Not Implemented |
SF0336 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $883 | $4,374 | Not Implemented |
SF0336 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $872 | $2,849 | Not Implemented |
SF0336 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2 | $7,040 | Implemented |
SF0336 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $234 | $557 | Implemented |
SF0336 # 11 Y:2006 | 11 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $955 | $2,480 | Implemented |
SF0336 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,076 | $16,625 | Implemented |
SF0336 # 13 Y:2006 | 13 | 2006 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $327 | $6,381 | Implemented |
LE0237 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $149,763 | $12,500 | Not Implemented |
LE0237 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $89,692 | $7,500 | Not Implemented |
LE0237 # 03 Y:2006 | 03 | 2006 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $64,774 | $2,000 | Implemented |
LE0237 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,057 | $1,000 | Implemented |
LE0237 # 05 Y:2006 | 05 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,961 | $200 | Not Implemented |
LE0237 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,658 | $3,000 | Not Implemented |
LE0237 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $3,162 | $900 | Implemented |
NC0332 # 01 Y:2006 | 01 | 2006 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,455 | $12,000 | Not Implemented |
NC0332 # 02 Y:2006 | 02 | 2006 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $39,950 | $210,000 | Not Implemented |
NC0332 # 03 Y:2006 | 03 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $17,210 | $28,200 | Not Implemented |
NC0332 # 04 Y:2006 | 04 | 2006 | INSULATE FEEDWATER TANK | $389 | $277 | Not Implemented |
NC0332 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $406 | $86 | Not Implemented |
AS0411 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,988 | $21,600 | Not Implemented |
AS0411 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,100 | $1,500 | Not Implemented |
AS0411 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,306 | $1,000 | Implemented |
AS0411 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $6,515 | $10,000 | Not Implemented |
AS0411 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,783 | $11,000 | Not Implemented |