IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,078

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0336 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31 $29,700 Not Implemented
SF0336 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $4,374 Not Implemented
SF0336 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $872 $2,849 Not Implemented
SF0336 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2 $7,040 Implemented
SF0336 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $234 $557 Implemented
SF0336 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $955 $2,480 Implemented
SF0336 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $16,625 Implemented
SF0336 # 13 Y:2006 13 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $327 $6,381 Implemented
LE0237 # 01 Y:2006 01 2006 REDESIGN PROCESS $149,763 $12,500 Not Implemented
LE0237 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $89,692 $7,500 Not Implemented
LE0237 # 03 Y:2006 03 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $64,774 $2,000 Implemented
LE0237 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $1,000 Implemented
LE0237 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $3,961 $200 Not Implemented
LE0237 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,658 $3,000 Not Implemented
LE0237 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $3,162 $900 Implemented
NC0332 # 01 Y:2006 01 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,455 $12,000 Not Implemented
NC0332 # 02 Y:2006 02 2006 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $39,950 $210,000 Not Implemented
NC0332 # 03 Y:2006 03 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $17,210 $28,200 Not Implemented
NC0332 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $389 $277 Not Implemented
NC0332 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $406 $86 Not Implemented
AS0411 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,988 $21,600 Not Implemented
AS0411 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,100 $1,500 Not Implemented
AS0411 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,306 $1,000 Implemented
AS0411 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $6,515 $10,000 Not Implemented
AS0411 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,783 $11,000 Not Implemented