IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0224 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $351,990 $119,086 n/a
MS0224 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,641 $181 Implemented
MS0224 # 09 Y:2003 09 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,477 $1,560 Not Implemented
MS0224 # 12 Y:2003 12 2003 INSULATE BARE EQUIPMENT $3,422 $301 Not Implemented
MS0224 # 03 Y:2003 03 2003 INSTALL STEAM TRAP $76,374 $12,262 Not Implemented
MS0224 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,515 $153,750 Not Implemented
MS0224 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $936,645 $8,400,000 n/a
MS0224 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,018 $50,000 n/a
MS0224 # 08 Y:2003 08 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $12,652 $0 Not Implemented
MS0224 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,243 $26,302 Implemented
MS0224 # 05 Y:2003 05 2003 MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM $37,053 $70,000 n/a
MS0224 # 11 Y:2003 11 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,861 $7,596 Implemented
MI0058 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,543 $223 Not Implemented
MI0058 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,548 $2,000 Not Implemented
MI0058 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,520 $400,000 Implemented
MI0058 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $250,000 $43,000 Implemented
MI0058 # 04 Y:2003 04 2003 METER WASTE WATER $12,786 $1,950 Not Implemented
MI0058 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,906 $696 Implemented
MI0057 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,331 $1,000 Not Implemented
MI0057 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $10,356 $3,900 Not Implemented
MI0057 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,707 $6,341 Not Implemented
MI0057 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,284 $441 Not Implemented
MI0057 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,829 $70,000 Not Implemented
MI0057 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,443 $400,000 Implemented
MI0057 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $250,000 $43,000 Not Implemented