IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 325411 Medicinal and Botanical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0148 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $10,764 $14,137 Implemented
UA0148 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,529 $1,740 Implemented
UA0148 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,888 $870 Not Implemented
UA0148 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,998 $100 Not Implemented
UA0148 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,387 $1,800 Not Implemented
MZ0146 # 01 Y:2014 01 2014 REDUCE VENTILATION AIR $14,453 $0 Implemented
MZ0146 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,621 $0 Implemented
MZ0146 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $2,500 Implemented
MZ0146 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $7,790 $4,375 Not Implemented
MZ0146 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $12,828 $3,375 Not Implemented
NC0391 # 01 Y:2009 01 2009 INCREASE AMOUNT OF CONDENSATE RETURNED $5,716 $10,000 Implemented
NC0391 # 02 Y:2009 02 2009 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,020 $25,000 Implemented
NC0391 # 03 Y:2009 03 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,889 $6,500 Not Implemented
NC0391 # 04 Y:2009 04 2009 DEVELOP A REPAIR/REPLACE POLICY $4,320 $6,886 Not Implemented
NC0391 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $257 $100 Implemented
NC0391 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,946 $59,958 Not Implemented
DL0031 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $0 Not Implemented
DL0031 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $693 $0 Implemented
DL0031 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,826 $0 Not Implemented
DL0031 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $2,224 $0 Not Implemented
DL0031 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $229 Implemented
DL0031 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,857 $5,600 Not Implemented
DL0031 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,430 $0 Not Implemented
DL0031 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $0 Not Implemented
DL0031 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,944 $7,500 Implemented