IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

769

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0670 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $244,946 $880,000 Not Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
OR0670 # 05 Y:2016 05 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,398 $2,405 Not Implemented
OR0670 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $29,141 $269,109 Not Implemented
OR0669 # 01 Y:2016 01 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,894 $5,100 Not Implemented
OR0669 # 02 Y:2016 02 2016 BURN WASTE OIL FOR HEAT $375,721 $189,945 Not Implemented
OR0669 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,019 $15,722 Not Implemented
OR0669 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,352 $500 Not Implemented
OR0669 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,233 $5,720 Not Implemented
OR0669 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $28,137 $340,762 Not Implemented
LE0414 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,057 $0 Implemented
LE0414 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $34,860 $36,000 Implemented
LE0414 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,251 $1,460 Not Implemented
LE0414 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $14,625 Implemented
LE0414 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,482 $10,500 Implemented
LE0414 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $1,140 Implemented
DL0158 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $1,270 $60 Not Implemented
DL0158 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $310,823 $38,750 Implemented
DL0158 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,940 $1,480 Not Implemented
DL0158 # 04 Y:2016 04 2016 UPGRADE OBSOLETE EQUIPMENT $13,830 $11,600 Not Implemented
DL0158 # 05 Y:2016 05 2016 REDUCE HEAT GAIN BY WINDOW TINTING $54,090 $104,500 Implemented
DL0158 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,560 $331,000 Not Implemented
DL0158 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,070 $380,000 Implemented