Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
769
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0910 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,400 | $10,000 | Implemented |
UD0910 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,016 | $1,000 | Not Implemented |
UD0910 # 05 Y:2014 | 05 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $332,549 | $400,000 | Not Implemented |
UD0910 # 06 Y:2014 | 06 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,208 | $40,430 | Not Implemented |
UD0910 # 07 Y:2014 | 07 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,334 | $18,902 | Implemented |
UD0910 # 08 Y:2014 | 08 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $377,548 | $1,083,820 | Implemented |
UD0910 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $45,862 | $9,000 | Not Implemented |
UD0910 # 10 Y:2014 | 10 | 2014 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $22,280 | $0 | Implemented |
UD0910 # 11 Y:2014 | 11 | 2014 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,744 | $12,000 | Implemented |
UD0910 # 12 Y:2014 | 12 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,390 | $0 | Not Implemented |
CO0692 # 01 Y:2014 | 01 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,780 | $10,910 | Not Implemented |
CO0692 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $39,420 | $1,250 | Implemented |
CO0692 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,790 | $21,020 | Implemented |
MZ0149 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $18,116 | $16,400 | Implemented |
MZ0149 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $4,128 | $6,040 | Implemented |
MZ0149 # 03 Y:2014 | 03 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $9,091 | $25,000 | Not Implemented |
MZ0149 # 04 Y:2014 | 04 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,580 | $25,750 | Not Implemented |
MZ0149 # 05 Y:2014 | 05 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $14,550 | $28,000 | Not Implemented |
MZ0149 # 06 Y:2014 | 06 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $46,961 | $5,500 | Not Implemented |
MI0256 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,834 | $20,160 | Not Implemented |
MI0256 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $23,626 | $13,599 | Implemented |
MI0256 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $23,619 | $80 | Implemented |
MI0256 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,420 | $1,660 | Implemented |
MI0256 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,196 | $3,960 | Implemented |
MI0256 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,634 | $80 | Implemented |